|
|
|
|
|
|
|
|
|
|
|
![]() |
![]() |
|
|||||||
|
|
|
|
|
||||||
|
|
|
|
|
||||||
APPLICATION AND ITS SCOPE
The wellpoint installations IgE-81 are designated do dewater construction excavations in grounds of small or medium permeability (permeability coefficient "k" below 40m / 24 h).
This installation can be used as an independent installation or installation supporting other dewatering intakes, in a one or two layer system. With one layer of wellpoints it is possible to lower water tables down to 4m, with two layers: down to 7m. |
WELLPOINT INSTALLATION
|
![]()
|
CHARACTERISTICS
Compared to conventional designs the wellpoint system IgE-81 is characteristic of:
Installing (founding) wellpoints in the ground. |
|